The planning application for the new Canal Basin has been submitted by our consultants during the week ending April 22nd 2012.
The plan submitted was based on the drawing shown below.
The exhibition of drawings is still in place in the Heritage Centre in Whitchurch Town Centre but will be removed soon.
The plan below has been produced based on the comments we have received. Click the icon that appears on the drawing to view full size.
It is anticipated some discussions will be required on the route of the path.
The aims here are;
- maintain the required wildlife corridor around the stream
- provide a reasonably direct route for the path
- have natural looking gentle slopes rather than retaining walls.

If you would like to receive a copy of the above drawing as a PDF or you have any comments or suggestions please email comments [at] whitchurchwaterway.org.uk
The Whitchurch Waterway Trust has decided to continue seeking comments on the proposed canal basin design and not to make the Planning application until after the AGM on March 21st.
Heritage Centre Exhibuition
This exhibition, of drawings and 3D views, at the Heritage centre, was installed on Saturday March 3rd. It will remain until a little after the Waterway Trust AGM on March 21st.
Any new information or amended drawings will be added when available.
More Information
Below is a full set of current information and extract from the design and access statement, which gives an overview of the project.
Click "Read More" to view.
This corrected plan drawing are correct the position of the archeway under Chemistry Bridge.
(Click Animation to see animation of boat moving in basin)
(Click "Read More" to View)
These drawings were received from Platt White on February 2nd 2012. Please send any comments ASAP.
Any revisions or new information will be posted here when received. (a new plan drawing updating the area around Chemistry Bridge is expected on Monday Feb 6th).
(Click "Read More" to View)
At the Annual General Meeting of the Trust on Wednesday March 17th 2010 a presentation was made putting forward several options for the further extension of the canal towards the town. Existing and prospective members were invited to attend the meeting to hear the presentation and discuss the options. The Option selected was Option C.
The Options discussed were: .......
Below are some pictures of the site as it is now to explain why the design shows the basin the shape that it is.
The basin is limited in size by the idea that it should be based within the constraints off being built on what is now solid ground.
Click "Read More" to see pictures of the site: