Latest Information on Canal Basin
The AGM voted in March for Option C which is a canal basin with the option retained to extend further into the town at a future date.
Site meetings with consultants have been held and a revised drawing made.
The latest drawing is shown below.
Click on this drawing to view the full size, fully detailed PDF file.
